T1 - Site screening scorecard
Evaluates up to ten sites against seven quantitative criteria, nine categorical criteria and six fatal flags covering site, power, connectivity, water, permitting and development conditions. The output is a ranked shortlist with explicit disqualification reasons.
T2 - Power & energy assessment
Builds 120 months of demand from deployment blocks and converts IT capacity into facility demand through PUE, auxiliary loads and seasonality. Up to five supply options are stacked in merit order.
Cost, water and emissions
Reports available capacity, dispatch, energy gaps, blended cost per MWh, equivalent cost per kW per month, water use and emissions for each scenario.