The data center development guide, from site to investment decision.

A five-stage, gated methodology for taking a data center from candidate sites to a signed investment decision, with the equations, evidence standards and benchmarks behind each step.

US$49 base price · One-time purchase · PowerPoint and PDF files
Applicable taxes are shown at checkout.

For development teams, investors and advisors who need a reference for the data center development process.

Step-by-step preview.

9 sample pages from the guide, each with a short note. The PDF version adds a page about the team.

Slide 1 of 11

  1. Slide 1 of 11: Data Center Development Practitioner Guide

    Data Center Development Practitioner Guide

    How a data center campus is evaluated in five stages, from a site that can actually be powered to an underwriting a lender will accept.

  2. Slide 2 of 11: Five stages, five questions, five decisions

    Five stages, five questions, five decisions

    The guide's map: site selection, power and energy, sizing and cost, underwriting and the decision, each closing on a gate.

  3. Slide 3 of 11: Power availability sets the programme

    Power availability sets the programme

    Construction can be accelerated with money; a utility interconnection date usually cannot. The guide starts from that constraint.

  4. Slide 4 of 11: The arithmetic that turns 20 MW into a real number

    The arithmetic that turns 20 MW into a real number

    Three lines convert a target IT load into a grid requirement, an energy ceiling and an annual cost, before any scoring.

  5. Slide 5 of 11: The blended price falls as the firm block takes the load

    The blended price falls as the firm block takes the load

    Energy price is the weighted average of what was dispatched each month, shown on the worked example.

  6. Slide 6 of 11: Ten lines carry most of the capital

    Ten lines carry most of the capital

    The ten largest lines of the worked example's budget, and why the power decision drives the budget rather than the other way round.

  7. Slide 7 of 11: The disbursement curve is an output

    The disbursement curve is an output

    Monthly disbursement and the cumulative S-curve that result from giving every line a window and a shape.

  8. Slide 8 of 11: A worked case: 20 MW, six contracts, a seven-year hold

    A worked case: 20 MW, six contracts, a seven-year hold

    One campus fully underwritten: coverage, debt yield, permanent loan, development spread, levered return and equity multiple.

  9. Slide 9 of 11: What actually moves the return

    What actually moves the return

    Six drivers ranked by how far each moves the levered return. Two of them dominate the other four.

  10. Slide 10 of 11: Ten failures that show up at credit committee

    Ten failures that show up at credit committee

    Where each failure starts and where it surfaces, which is the argument for running the stages in order.

  11. Slide 11 of 11: What is in the download

    What is in the download

    The files included and what to know before you buy.

Download the PDF preview (12 pages, 2.8 MB)Illustrative demonstration data. Not investment advice.

A reference for every stage of development.

Use it when you need a structured reference for the data center development process. Bring your project context and the stage you are working through.

Read the full listing on Flevy

What to know before buying

  • Supplied as PowerPoint (PPTX) and PDF.
  • Software-agnostic: it describes a discipline, not a spreadsheet.
  • Choose a model separately if you need an Excel workbook.
  • Benchmarks are references to confirm against current market evidence.

What the guide covers.

Site and power

A 16-criterion, five-category scoring model with six hard disqualifiers, then a 120-month bottom-up load model from racks, pods, halls and AI accelerators, PUE decomposition, cooling technologies and a merit-order supply stack.

Sizing and capital cost

IT MW to white space, gross area and land take with redundancy levels, a line-item CapEx build, estimating basis, contingency policy, cost-intensity benchmarks and an S-curve disbursement calendar.

Underwriting and decision

Lease revenue and NOI, construction and permanent debt sized by DSCR, debt yield and LTV, exit valuation, development spread, IRR and equity multiple, then a decision pack with hurdles and conditions precedent.

What you receive.

Files are delivered through Flevy and stay available in your Flevy download library.

  • PPTX
    126-slide Practitioner Guide (PowerPoint, with speaker notes)
  • PDF
    161-page Practitioner Handbook (PDF)
  • REF
    Glossary, symbols index, reference benchmarks and bibliography
  • CASE
    One 20 MW IT campus example carried through both documents

Before you buy.

PowerPoint and PDF

Supplied as a PowerPoint presentation (PPTX) with speaker notes and a PDF handbook. It is a reference, not a spreadsheet.

Purchase on Flevy

Prices are in US dollars. Flevy handles payment, delivery and purchase support; applicable taxes are shown at checkout.

License and questions

The published license covers up to 10 users at one business location. Questions go to ExpertPro through the author page on Flevy. Purchase terms

Built by the ExpertPro team.

ExpertPro builds the financial and decision infrastructure behind capital projects, at the intersection of project finance, engineering economics and data.

  • 7senior specialists
  • 100+years of combined experience
  • 15+professional certifications
  • 50+delivered projects

Master's degrees in industrial engineering, information technology and business, a degree in mathematics, and programmes from MIT (applied AI) and HarvardX (data science). Delivery in five Latin American countries, across energy and utilities, transport, logistics, agroindustry and healthcare.

The team

  • Project finance and public-private partnerships, PMP® and APMG CP3P® certified
  • Data architecture and data science, led by a mathematician
  • Process automation and governance, with more than twenty years in banking
  • Information security and compliance: ISO/IEC 27001 Lead Auditor and CEH
  • Enterprise systems integration and machine-learning engineering

Every guide

  • Five stages, each closing on a documented decision
  • One worked example carried from the first page to the last
  • Formulas and figures you can check with a calculator
  • Speaker notes, glossary, benchmarks and a source bibliography

Related documents.

Tools that come before, after or alongside this one in the same workflow.

Browse all 18 documents

See the full listing
and preview on Flevy.

One-time purchase of US$49. Applicable taxes are shown at checkout.

View US$49 offer on Flevy