Data center CapEx, underwriting and committee decision.

Take a defined data center program from technical budget to construction funding, project finance and a documented investment committee decision, in three connected Excel models.

US$119 base price · One-time purchase · Desktop Excel required
Applicable taxes are shown at checkout.

For data center developers, digital-infrastructure funds, investment committees and project finance teams.

Step-by-step preview.

10 slides from the worked example, each with a short note: what goes in, how it works and what comes out. The PDF version adds a page about the team.

Slide 1 of 10

  1. Slide 1 of 10: Data Center CapEx & Underwriting Pack

    Data Center CapEx & Underwriting Pack

    From a defined data center programme to a capital budget, a financed case and a committee decision, in three connected Excel models.

  2. Slide 2 of 10: T3 prices the build; T4 prices the money

    T3 prices the build; T4 prices the money

    T3 turns the programme into phases and 32 priced lines and exports the amounts with a 60-month disbursement series; financing costs stay in T4.

  3. Slide 3 of 10: Ten lines carry most of the capital

    Ten lines carry most of the capital

    Where the demo's $180.3 million goes. Electrical fit-out, mechanical and core and shell lead, which is where estimating effort belongs.

  4. Slide 4 of 10: The disbursement curve is an output, not a drawing

    The disbursement curve is an output, not a drawing

    Every line carries a window and a curve; the monthly bars and the campus S-curve are what those decisions add up to.

  5. Slide 5 of 10: $9,017,394 per IT megawatt, benchmarked

    $9,017,394 per IT megawatt, benchmarked

    The budget output splits the total by category, with share of total and $/MW, and flags the result against its benchmark band.

  6. Slide 6 of 10: T4: which covenant binds?

    T4: which covenant binds?

    DSCR 1.38x and debt yield 11.2% at stabilization. The debt-yield floor caps the permanent loan at $291.4M.

  7. Slide 7 of 10: T4: sponsor, equity and lender panels

    T4: sponsor, equity and lender panels

    Yield on cost, levered IRR, equity multiples and loan metrics for the demo campus, with the conventions stated beside them.

  8. Slide 8 of 10: T5: four scores draw the shape of the risk

    T5: four scores draw the shape of the risk

    Under the balanced objective the demo ranks four runs; the base case scores 1.000 and wins on every scored dimension.

  9. Slide 9 of 10: T5: what actually moves the return

    T5: what actually moves the return

    Six drivers ranked by how far each moves the levered IRR. Contract price and capital cost matter far more than the other four.

  10. Slide 10 of 10: What is in the download

    What is in the download

    The files included and what to know before you buy.

Download the PDF preview (11 pages, 2.4 MB)Illustrative demonstration data. Not investment advice.

For a project whose site and power strategy are already defined.

Use this pack when you are assembling a capital budget and investment review. Bring a prepared project scope, cost assumptions and the inputs for the cases you want to compare.

Read the full listing on Flevy

What to know before buying

  • Desktop Excel 2019 or Microsoft 365.
  • Site and power assumptions are prepared outside the pack (the T1 and T2 models are not included).
  • It is an underwriting and decision toolkit, not a tax model, legal model or final lender model.
  • It does not replace technical due diligence.

What the three models do.

T3 - Technical sizing & CapEx budget

A 32-line conceptual budget across land, hard costs and soft costs. Each line has its own execution window and a straight-line, S-curve or manual disbursement profile, producing a monthly CapEx calendar and a construction S-curve.

T4 - Financial model

A 180-month underwriting case covering customer contracts, operating costs, senior and mezzanine construction debt, permanent financing and exit valuation. Permanent debt is sized by the binding minimum of loan-to-value, debt service coverage and debt yield.

T5 - Comparison dashboard

Receives up to twelve completed T4 runs and compares them against an explicit investment objective and absolute hurdles, with a ranking, a sensitivity tornado and a one-page committee recommendation.

What you receive.

Files are delivered through Flevy and stay available in your Flevy download library.

  • XLSX
    Three Excel models (T3, T4 and T5) with three dedicated user manuals
  • INPUTS
    The Upstream Input Adapter and a Pack Quick Start
  • DEMO
    A worked demonstration case
  • TERMS
    Licence, scope and disclaimer documentation (ZIP bundle)

Before you buy.

Desktop Excel

Excel 2019 or Microsoft 365 on desktop. Browser Excel and Google Sheets compatibility are not promised.

Purchase on Flevy

Prices are in US dollars. Flevy handles payment, delivery and purchase support; applicable taxes are shown at checkout.

License and questions

The published license covers up to 10 users at one business location. Questions go to ExpertPro through the author page on Flevy. Purchase terms

Built by the ExpertPro team.

ExpertPro builds the financial and decision infrastructure behind capital projects, at the intersection of project finance, engineering economics and data.

  • 7senior specialists
  • 100+years of combined experience
  • 15+professional certifications
  • 50+delivered projects

Master's degrees in industrial engineering, information technology and business, a degree in mathematics, and programmes from MIT (applied AI) and HarvardX (data science). Delivery in five Latin American countries, across energy and utilities, transport, logistics, agroindustry and healthcare.

The team

  • Project finance and public-private partnerships, PMP® and APMG CP3P® certified
  • Data architecture and data science, led by a mathematician
  • Process automation and governance, with more than twenty years in banking
  • Information security and compliance: ISO/IEC 27001 Lead Auditor and CEH
  • Enterprise systems integration and machine-learning engineering

Every model

  • Built to the FAST Standard 02c: Flexible, Appropriate, Structured, Transparent
  • No macros and no hidden logic; one formula per calculation row
  • A documented source and status behind every input
  • A checks panel that must read green before results leave the workbook
  • A complete user manual and a worked demonstration case

Related documents.

Tools that come before, after or alongside this one in the same workflow.

Browse all 18 documents

See the full listing
and preview on Flevy.

One-time purchase of US$119. Applicable taxes are shown at checkout.

View US$119 offer on Flevy