Solar PV project finance, from site screening to committee.
Five connected Excel instruments take a utility-scale solar project from a long list of candidate sites to a documented investment committee decision. Debt is sized on P90 energy while equity is priced on P50.
US$189 base price · One-time purchase · Desktop Excel required Applicable taxes are shown at checkout.
For solar developers, yield engineers, project finance modelers, lenders' and investors' analysts and investment committees.
Step-by-step preview.
9 slides from the worked example, each with a short note: what goes in, how it works and what comes out. The PDF version adds a page about the team.
Slide 1 of 9
01
Solar PV Project Finance Suite
Five Excel models that carry a utility-scale solar project from site screening to a signed committee decision.
02
Each workbook answers one question and hands it on
Screening, energy yield, CapEx, finance and the committee comparison, each with its owner and the export it passes to the next workbook.
03
One continuous demo case
A 50 MWp DC / 38 MWac tracker plant in the Atacama: site score 4.61, 127,631 MWh P50 in year one, $43.6M CapEx, 11.81% equity IRR and a 1.30x minimum DSCR.
04
One distribution, read at three points
P50, P75 and P90 come from the same distribution: equity is measured on the expected case, debt is sized on the case that holds nine years in ten.
05
S2: every percentage point between sunlight and the meter
The loss stack from the plane of array to the export meter, visible and editable rather than a single assumed performance ratio.
06
S3: the S-curve is a consequence, not an input
Each budget line carries its own window and curve; the monthly total and the cumulative S-curve fall out of 32 independent decisions.
07
S4: sculpted debt bends to the cash flow
Principal is whatever the target coverage leaves after interest, so the debt profile rises with the plant's cash and stops when the loan is repaid.
08
S5: four financed runs, one hurdle, one recommendation
The dashboard compares runs that were financed properly and shows which ones clear the committee's own bar.
09
What is in the download
The files included and what to know before you buy.
The complete solar development and finance workflow.
Use it when you need a solar project assessment workflow across several models. Bring site information, energy-yield assumptions, capital costs and financing terms.
It does not replace an on-site measurement campaign, a PVsyst-class hourly simulation or an independent engineer's report.
It is not a lender's credit model or a tax opinion.
Benchmark bands are sourced placeholders to confirm against current market evidence.
What the five instruments do.
S1 & S2 - Sites and energy
Rank up to ten sites across five weighted categories with six fatal flags, then build monthly production from irradiance, losses, availability, curtailment and degradation, converting uncertainty into P75 and P90 exceedance factors.
S3 & S4 - CapEx and finance
A 32-line budget phased month by month, then 25 years of operations with equity-first funding, interest during construction, a six-month DSRA and senior debt sized at the lesser of the gearing cap and the present value of P90 CFADS, then sculpted.
S5 - Committee dashboard
Receives up to twelve sealed S4 runs, checks each one, judges them against four explicit hurdles, ranks them and prints a one-page decision card with a tornado chart.
What you receive.
Files are delivered through Flevy and stay available in your Flevy download library.
XLSX
Five Excel workbooks (S1 to S5)
GUIDE
A Master Guide covering the chain, scenario governance and the check catalogue
GUIDE
Five dedicated user manuals
DEMO
A worked demo: a 50 MWp single-axis tracker plant with a 15-year PPA and a merchant tail
Before you buy.
Desktop Excel
Excel 2019 or Microsoft 365 on desktop. Browser Excel and Google Sheets compatibility are not promised.
Purchase on Flevy
Prices are in US dollars. Flevy handles payment, delivery and purchase support; applicable taxes are shown at checkout.
License and questions
The published license covers up to 10 users at one business location. Questions go to ExpertPro through the author page on Flevy. Purchase terms
Built by the ExpertPro team.
ExpertPro builds the financial and decision infrastructure behind capital projects, at the intersection of project finance, engineering economics and data.
7senior specialists
100+years of combined experience
15+professional certifications
50+delivered projects
Master's degrees in industrial engineering, information technology and business, a degree in mathematics, and programmes from MIT (applied AI) and HarvardX (data science). Delivery in five Latin American countries, across energy and utilities, transport, logistics, agroindustry and healthcare.
The team
Project finance and public-private partnerships, PMP® and APMG CP3P® certified
Data architecture and data science, led by a mathematician
Process automation and governance, with more than twenty years in banking
Information security and compliance: ISO/IEC 27001 Lead Auditor and CEH
Enterprise systems integration and machine-learning engineering
Every model
Built to the FAST Standard 02c: Flexible, Appropriate, Structured, Transparent
No macros and no hidden logic; one formula per calculation row
A documented source and status behind every input
A checks panel that must read green before results leave the workbook
A complete user manual and a worked demonstration case
Related documents.
Tools that come before, after or alongside this one in the same workflow.